{"id":755,"date":"2025-02-28T21:21:32","date_gmt":"2025-02-28T21:21:32","guid":{"rendered":"https:\/\/higecomore.com\/cci-central-plant-controller\/"},"modified":"2026-02-25T13:32:01","modified_gmt":"2026-02-25T13:32:01","slug":"cci-central-plant-controller","status":"publish","type":"page","link":"https:\/\/higecomore.com\/en\/cci-central-plant-controller\/","title":{"rendered":"CCI &#8211; Central Plant Controller"},"content":{"rendered":"\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-2850da5\" data-block-id=\"2850da5\"><style>.stk-2850da5 {align-items:center !important;margin-top:80px !important;margin-bottom:60px !important;display:flex !important;}.stk-2850da5-column{max-width:1200px !important;min-width:auto !important;margin-right:auto !important;margin-left:auto !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-2850da5-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-59c5756\" data-v=\"4\" data-block-id=\"59c5756\"><style>@media screen and (min-width:690px){.stk-59c5756 {flex:var(--stk-flex-grow, 1) 1 calc(59.9% - var(--stk-column-gap, 0px) * 1 \/ 2 ) !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-59c5756-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-59c5756-inner-blocks\">\n<p class=\"wp-block-paragraph\"><span style=\"color: var(--theme-palette-color-1, #A2D45E);\" class=\"stk-highlight\">REGULATORY COMPLIANCE AND POWER PLANT ADVANCED CONTROL<\/span><\/p>\n\n\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-a374940\" id=\"senergy-cci-controllore-centrale-di-impianto\" data-block-id=\"a374940\"><h2 class=\"stk-block-heading__text has-text-align-left\">Senergy CCI &#8211; Central Plant Controller<\/h2><\/div>\n\n\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-b4389dc\" data-block-id=\"b4389dc\"><p class=\"stk-block-text__text\">The Central Plant Controller (CCI) is a monitoring and control system installed at the point of delivery that allows DSOs to monitor and regulate the generation plant, enabling it to participate in grid balancing.<br\/>The CCI was introduced in Italy in 2022 with the V1 and V2 variants of the CEI 0-16 standard. The key requirements requested by the regulation include the PF1 (Monitoring), PF2 (Regulation and Control), and PF3 (Participation in Flexibility Markets and Plant Optimization<strong>)<\/strong> functions, which are essential to ensuring the security and stability of the national electricity system. <\/p><\/div>\n\n\n\n<div class=\"wp-block-stackable-subtitle stk-block-subtitle stk-block stk-ab040f2\" data-block-id=\"ab040f2\"><p class=\"stk-block-subtitle__text stk-subtitle\">The <strong>Senergy CCI Higeco More<\/strong> solution is designed to fully meet all technical requirements, offering all the functionalities (PF1, PF2 and PF3) in a single device, with maximum reliability and ease of integration.<\/p><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-ffaa17c\" data-v=\"4\" data-block-id=\"ffaa17c\"><style>@media screen and (min-width:690px){.stk-ffaa17c {flex:var(--stk-flex-grow, 1) 1 calc(40.099999999999994% - var(--stk-column-gap, 0px) * 1 \/ 2 ) !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-ffaa17c-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-ffaa17c-inner-blocks\">\n<div class=\"wp-block-stackable-image stk-block-image stk-block stk-061df51\" data-block-id=\"061df51\"><figure><span class=\"stk-img-wrapper stk-image--shape-stretch\"><img loading=\"lazy\" decoding=\"async\" class=\"stk-img wp-image-263\" src=\"https:\/\/higecomore.com\/wp-content\/uploads\/2025\/02\/CCI_aperto.png\" width=\"1000\" height=\"932\" alt=\"CCI Higeco More open panel\" srcset=\"https:\/\/higecomore.com\/wp-content\/uploads\/2025\/02\/CCI_aperto.png 1000w, https:\/\/higecomore.com\/wp-content\/uploads\/2025\/02\/CCI_aperto-300x280.png 300w, https:\/\/higecomore.com\/wp-content\/uploads\/2025\/02\/CCI_aperto-768x716.png 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/span><\/figure><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-stackable-columns alignfull stk-block-columns stk-block stk-42560c5 stk-block-background\" data-block-id=\"42560c5\"><style>.stk-42560c5 {margin-bottom:60px !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-42560c5-column alignfull\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-91f8ab2\" data-v=\"4\" data-block-id=\"91f8ab2\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-91f8ab2-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-91f8ab2-inner-blocks\">\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-ddeafea\" data-block-id=\"ddeafea\"><style>.stk-ddeafea-column{max-width:1200px !important;min-width:auto !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-ddeafea-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-9ac8e21\" data-v=\"4\" data-block-id=\"9ac8e21\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-9ac8e21-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-9ac8e21-inner-blocks\">\n<div class=\"wp-block-stackable-icon stk-block-icon has-text-align-center stk-block stk-188dee2\" data-block-id=\"188dee2\"><style>.stk-188dee2 {margin-bottom:0px !important;}.stk-188dee2 .stk--svg-wrapper .stk--inner-svg svg:last-child, .stk-188dee2 .stk--svg-wrapper .stk--inner-svg svg:last-child :is(g, path, rect, polygon, ellipse){fill:var(--theme-palette-color-8, #ffffff) !important;}.stk-188dee2 .stk--svg-wrapper .stk--inner-svg{background-color:var(--theme-palette-color-1, #A2D45E) !important;border-radius:100% !important;padding:12px !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:0px !important;border-left-width:0px !important;}<\/style><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-188dee2\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-188-dee-2-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-188-dee-2-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path d=\"M438.6 105.4c12.5 12.5 12.5 32.8 0 45.3l-256 256c-12.5 12.5-32.8 12.5-45.3 0l-128-128c-12.5-12.5-12.5-32.8 0-45.3s32.8-12.5 45.3 0L160 338.7 393.4 105.4c12.5-12.5 32.8-12.5 45.3 0z\"><\/path><\/svg><\/div><\/span><\/div>\n\n\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-4b6d309\" data-block-id=\"4b6d309\"><p class=\"stk-block-text__text has-text-align-center\"><strong>PF1, PF2 e PF3 features<\/strong><\/p><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-ce211be\" data-v=\"4\" data-block-id=\"ce211be\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-ce211be-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-ce211be-inner-blocks\">\n<div class=\"wp-block-stackable-icon stk-block-icon has-text-align-center stk-block stk-fef2de4\" data-block-id=\"fef2de4\"><style>.stk-fef2de4 {margin-bottom:0px !important;}.stk-fef2de4 .stk--svg-wrapper .stk--inner-svg svg:last-child, .stk-fef2de4 .stk--svg-wrapper .stk--inner-svg svg:last-child :is(g, path, rect, polygon, ellipse){fill:var(--theme-palette-color-8, #ffffff) !important;}.stk-fef2de4 .stk--svg-wrapper .stk--inner-svg{background-color:var(--theme-palette-color-1, #A2D45E) !important;border-radius:100% !important;padding:12px !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:0px !important;border-left-width:0px !important;}<\/style><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-fef2de4\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-fef-2-de-4-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-fef-2-de-4-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 384 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path d=\"M64 464c-8.8 0-16-7.2-16-16V64c0-8.8 7.2-16 16-16H224v80c0 17.7 14.3 32 32 32h80V448c0 8.8-7.2 16-16 16H64zM64 0C28.7 0 0 28.7 0 64V448c0 35.3 28.7 64 64 64H320c35.3 0 64-28.7 64-64V154.5c0-17-6.7-33.3-18.7-45.3L274.7 18.7C262.7 6.7 246.5 0 229.5 0H64zm56 256c-13.3 0-24 10.7-24 24s10.7 24 24 24H264c13.3 0 24-10.7 24-24s-10.7-24-24-24H120zm0 96c-13.3 0-24 10.7-24 24s10.7 24 24 24H264c13.3 0 24-10.7 24-24s-10.7-24-24-24H120z\"><\/path><\/svg><\/div><\/span><\/div>\n\n\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-d98de49\" data-block-id=\"d98de49\"><p class=\"stk-block-text__text has-text-align-center\"><strong>Certified CEI 0-16<\/strong><\/p><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-5436817\" data-v=\"4\" data-block-id=\"5436817\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-5436817-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-5436817-inner-blocks\">\n<div class=\"wp-block-stackable-icon stk-block-icon has-text-align-center stk-block stk-55543ff\" data-block-id=\"55543ff\"><style>.stk-55543ff {margin-bottom:0px !important;}.stk-55543ff .stk--svg-wrapper .stk--inner-svg svg:last-child, .stk-55543ff .stk--svg-wrapper .stk--inner-svg svg:last-child :is(g, path, rect, polygon, ellipse){fill:var(--theme-palette-color-8, #ffffff) !important;}.stk-55543ff .stk--svg-wrapper .stk--inner-svg{background-color:var(--theme-palette-color-1, #A2D45E) !important;border-radius:100% !important;padding:12px !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:0px !important;border-left-width:0px !important;}<\/style><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-55543ff\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-55543-ff-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-55543-ff-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path d=\"M256 0c4.6 0 9.2 1 13.4 2.9L457.7 82.8c22 9.3 38.4 31 38.3 57.2c-.5 99.2-41.3 280.7-213.6 363.2c-16.7 8-36.1 8-52.8 0C57.3 420.7 16.5 239.2 16 140c-.1-26.2 16.3-47.9 38.3-57.2L242.7 2.9C246.8 1 251.4 0 256 0zm0 66.8V444.8C394 378 431.1 230.1 432 141.4L256 66.8l0 0z\"><\/path><\/svg><\/div><\/span><\/div>\n\n\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-25299f5\" data-block-id=\"25299f5\"><p class=\"stk-block-text__text has-text-align-center\"><strong>Cybersecurity<\/strong><\/p><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-f408ab5\" data-block-id=\"f408ab5\"><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-f408ab5-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-8a8c4c7\" data-v=\"4\" data-block-id=\"8a8c4c7\"><style>@media screen and (min-width:690px){.stk-8a8c4c7 {flex:var(--stk-flex-grow, 1) 1 calc(50% - var(--stk-column-gap, 0px) * 1 \/ 2 ) !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-8a8c4c7-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-8a8c4c7-inner-blocks\">\n<div class=\"wp-block-stackable-image stk-block-image stk-block stk-556b9c9\" data-block-id=\"556b9c9\"><style>.stk-556b9c9 .stk-img-wrapper{width:80% !important;}<\/style><figure><span class=\"stk-img-wrapper stk-image--shape-stretch\"><img loading=\"lazy\" decoding=\"async\" class=\"stk-img wp-image-1007\" src=\"https:\/\/higecomore.com\/wp-content\/uploads\/2025\/09\/Schema_CCI-1.png\" width=\"2241\" height=\"1931\" alt=\"CCI operating diagram\" srcset=\"https:\/\/higecomore.com\/wp-content\/uploads\/2025\/09\/Schema_CCI-1.png 2241w, https:\/\/higecomore.com\/wp-content\/uploads\/2025\/09\/Schema_CCI-1-300x259.png 300w, https:\/\/higecomore.com\/wp-content\/uploads\/2025\/09\/Schema_CCI-1-1024x882.png 1024w, https:\/\/higecomore.com\/wp-content\/uploads\/2025\/09\/Schema_CCI-1-768x662.png 768w, https:\/\/higecomore.com\/wp-content\/uploads\/2025\/09\/Schema_CCI-1-1536x1324.png 1536w, https:\/\/higecomore.com\/wp-content\/uploads\/2025\/09\/Schema_CCI-1-2048x1765.png 2048w\" sizes=\"auto, (max-width: 2241px) 100vw, 2241px\" \/><\/span><\/figure><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-f3afeff\" data-v=\"4\" data-block-id=\"f3afeff\"><style>@media screen and (min-width:690px){.stk-f3afeff {flex:var(--stk-flex-grow, 1) 1 calc(50% - var(--stk-column-gap, 0px) * 1 \/ 2 ) !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-f3afeff-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-f3afeff-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-b738b10\" data-block-id=\"b738b10\"><style>.stk-b738b10 {margin-bottom:0px !important;}<\/style><p class=\"stk-block-text__text\"><span style=\"color: var(--theme-palette-color-1, #A2D45E);\" class=\"stk-highlight\">SENERGY CCI &#8211; CENTRAL PLANT CONTROLLER<\/span><\/p><\/div>\n\n\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-4df01d3\" id=\"caratteristiche-e-funzionalita\" data-block-id=\"4df01d3\"><h2 class=\"stk-block-heading__text has-text-align-left\">Features and functionality<\/h2><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon-list stk-block-icon-list stk-block stk-9f5e121\" data-block-id=\"9f5e121\"><style>.stk-9f5e121 {--stk-icon-list-column-count:1 !important;--stk-icon-list-row-gap:8px !important;--stk-icon-list-marker-color:var(--theme-palette-color-1, #A2D45E) !important;}<\/style><svg style=\"display:none\"><defs><g id=\"stk-icon-list__icon-svg-def-9f5e121\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 190 190\"><polygon points=\"173.8,28.4 60.4,141.8 15.7,97.2 5.1,107.8 60.4,163 184.4,39 173.8,28.4\"\/><\/svg><\/g><\/defs><\/svg><ul class=\"stk-block-icon-list__ul stk-block-icon-list--column\">\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-a753b11\" data-block-id=\"a753b11\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-9f5e121\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\">CEI 0-16 Certification<\/span><\/div><\/li>\n\n\n\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-2a225c1\" data-block-id=\"2a225c1\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-9f5e121\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\">Precise regulation of active and reactive power and voltage at the grid connection point<\/span><\/div><\/li>\n\n\n\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-f75ec85\" data-block-id=\"f75ec85\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-9f5e121\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\">Monitoring of the delivery point and individual generators<\/span><\/div><\/li>\n\n\n\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-6aad3d3\" data-block-id=\"6aad3d3\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-9f5e121\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\">Control of the power plant in autonomous mode (frequency response, response to voltage variations&#8230;) or via external commands (control of P, Q, PF, V&#8230;)<\/span><\/div><\/li>\n\n\n\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-d629c2f\" data-block-id=\"d629c2f\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-9f5e121\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\">Complete turnkey service from design to field testing<\/span><\/div><\/li>\n\n\n\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-be8b497\" data-block-id=\"be8b497\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-9f5e121\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\">Cyber \u200b\u200bsecurity guaranteed by IsaSecure SDLA IEC 62443-4-1 and CSA IEC 62443-4-2 certifications<\/span><\/div><\/li>\n\n\n\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-4dab423\" data-block-id=\"4dab423\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-9f5e121\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\">&nbsp;Protocols IEC61850, IEC60870-101\/104, DNP3, Modbus TCP, OPC UA<\/span><\/div><\/li>\n\n\n\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-1c38e17\" data-block-id=\"1c38e17\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-9f5e121\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\">&nbsp;Intuitive and easy-to-use web-based graphical user interface<\/span><\/div><\/li>\n<\/ul><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-stackable-columns alignfull stk-block-columns stk-block stk-ebcd21b stk-block-background\" data-block-id=\"ebcd21b\"><style>.stk-ebcd21b {margin-bottom:80px !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-ebcd21b-column alignfull\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-a7c8f1e\" data-v=\"4\" data-block-id=\"a7c8f1e\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-a7c8f1e-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-a7c8f1e-inner-blocks\">\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-07c6eb1\" data-block-id=\"07c6eb1\"><style>.stk-07c6eb1-column{max-width:1200px !important;min-width:auto !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-07c6eb1-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-cc071d9\" data-v=\"4\" data-block-id=\"cc071d9\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-cc071d9-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-cc071d9-inner-blocks\">\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-78f9f66\" data-block-id=\"78f9f66\"><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-78f9f66-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-291d02b\" data-v=\"4\" data-block-id=\"291d02b\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-291d02b-container stk--no-background stk--no-padding\"><div class=\"has-text-align-center stk-block-content stk-inner-blocks stk-291d02b-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-829fb6c\" data-block-id=\"829fb6c\"><style>.stk-829fb6c {margin-bottom:0px !important;}<\/style><p class=\"stk-block-text__text\"><span style=\"color: var(--theme-palette-color-1, #A2D45E);\" class=\"stk-highlight\">DOWNLOADS<\/span><\/p><\/div>\n\n\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-f86c21f\" id=\"scarica-tutti-i-documenti\" data-block-id=\"f86c21f\"><style>.stk-f86c21f {margin-bottom:0px !important;}<\/style><h2 class=\"stk-block-heading__text\">Download all documents<\/h2><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-5713e61\" data-block-id=\"5713e61\"><style>.stk-5713e61 {margin-bottom:0px !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-5713e61-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-e921bcc\" data-v=\"4\" data-block-id=\"e921bcc\"><style>@media screen and (min-width:690px){.stk-e921bcc {flex:var(--stk-flex-grow, 1) 1 calc(30% - var(--stk-column-gap, 0px) * 1 \/ 2 ) !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-e921bcc-container stk--no-background stk--no-padding\"><div class=\"has-text-align-right stk-block-content stk-inner-blocks stk-e921bcc-inner-blocks\">\n<div class=\"wp-block-stackable-button-group stk-block-button-group stk-block stk-243582c\" data-block-id=\"243582c\"><div class=\"stk-row stk-inner-blocks stk-block-content stk-button-group\">\n<div class=\"wp-block-stackable-button stk-block-button stk-block stk-85f36af\" data-block-id=\"85f36af\"><a class=\"stk-link stk-button stk--hover-effect-darken\" href=\"https:\/\/higecomore.com\/wp-content\/uploads\/2025\/12\/certificazioni-CCI-HigecoMore-12_2025.zip&lt;br\/&gt;&lt;br\/&gt;\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path d=\"M288 32c0-17.7-14.3-32-32-32s-32 14.3-32 32V274.7l-73.4-73.4c-12.5-12.5-32.8-12.5-45.3 0s-12.5 32.8 0 45.3l128 128c12.5 12.5 32.8 12.5 45.3 0l128-128c12.5-12.5 12.5-32.8 0-45.3s-32.8-12.5-45.3 0L288 274.7V32zM64 352c-35.3 0-64 28.7-64 64v32c0 35.3 28.7 64 64 64H448c35.3 0 64-28.7 64-64V416c0-35.3-28.7-64-64-64H346.5l-45.3 45.3c-25 25-65.5 25-90.5 0L165.5 352H64zm368 56a24 24 0 1 1 0 48 24 24 0 1 1 0-48z\"><\/path><\/svg><\/div><\/span><span class=\"stk-button__inner-text\">Download<\/span><\/a><\/div>\n<\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-12ea2bc\" data-v=\"4\" data-block-id=\"12ea2bc\"><style>@media screen and (min-width:690px){.stk-12ea2bc {flex:var(--stk-flex-grow, 1) 1 calc(70% - var(--stk-column-gap, 0px) * 1 \/ 2 ) !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-12ea2bc-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-12ea2bc-inner-blocks\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-dd3c6ef\" id=\"certificazioni-cci-higeco-more\" data-block-id=\"dd3c6ef\"><style>.stk-dd3c6ef {margin-bottom:0px !important;}<\/style><h5 class=\"stk-block-heading__text\">CCI Higeco More Certifications<\/h5><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Consult the copy of all the CCI Higeco More certifications required by the CEI 0-16 standard<\/p>\n<\/div><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-b701b79\" data-block-id=\"b701b79\"><style>.stk-b701b79 {margin-bottom:0px !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-b701b79-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-9fc7058\" data-v=\"4\" data-block-id=\"9fc7058\"><style>@media screen and (min-width:690px){.stk-9fc7058 {flex:var(--stk-flex-grow, 1) 1 calc(30% - var(--stk-column-gap, 0px) * 1 \/ 2 ) !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-9fc7058-container stk--no-background stk--no-padding\"><div class=\"has-text-align-right stk-block-content stk-inner-blocks stk-9fc7058-inner-blocks\">\n<div class=\"wp-block-stackable-button-group stk-block-button-group stk-block stk-2e898d7\" data-block-id=\"2e898d7\"><div class=\"stk-row stk-inner-blocks stk-block-content stk-button-group\">\n<div class=\"wp-block-stackable-button stk-block-button stk-block stk-345cb67\" data-block-id=\"345cb67\"><a class=\"stk-link stk-button stk--hover-effect-darken\" href=\"https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Brochure_CCI_v3_ENG.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path d=\"M288 32c0-17.7-14.3-32-32-32s-32 14.3-32 32V274.7l-73.4-73.4c-12.5-12.5-32.8-12.5-45.3 0s-12.5 32.8 0 45.3l128 128c12.5 12.5 32.8 12.5 45.3 0l128-128c12.5-12.5 12.5-32.8 0-45.3s-32.8-12.5-45.3 0L288 274.7V32zM64 352c-35.3 0-64 28.7-64 64v32c0 35.3 28.7 64 64 64H448c35.3 0 64-28.7 64-64V416c0-35.3-28.7-64-64-64H346.5l-45.3 45.3c-25 25-65.5 25-90.5 0L165.5 352H64zm368 56a24 24 0 1 1 0 48 24 24 0 1 1 0-48z\"><\/path><\/svg><\/div><\/span><span class=\"stk-button__inner-text\">Download<\/span><\/a><\/div>\n<\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-626d764\" data-v=\"4\" data-block-id=\"626d764\"><style>@media screen and (min-width:690px){.stk-626d764 {flex:var(--stk-flex-grow, 1) 1 calc(70% - var(--stk-column-gap, 0px) * 1 \/ 2 ) !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-626d764-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-626d764-inner-blocks\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-ed16d39\" id=\"brochure-prodotto-cci\" data-block-id=\"ed16d39\"><style>.stk-ed16d39 {margin-bottom:0px !important;}<\/style><h5 class=\"stk-block-heading__text\">Brochure CCI<\/h5><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Learn more about all the technical details and more of the Higeco More Central Plant Controller (CCI) solution<\/p>\n<\/div><\/div><\/div>\n<\/div><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-a41befc\" data-block-id=\"a41befc\"><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-a41befc-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-db82c6e\" data-v=\"4\" data-block-id=\"db82c6e\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-db82c6e-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-db82c6e-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-f0c70bf\" data-block-id=\"f0c70bf\"><style>.stk-f0c70bf {margin-bottom:0px !important;}<\/style><p class=\"stk-block-text__text\"><span style=\"color: var(--theme-palette-color-1, #A2D45E);\" class=\"stk-highlight\">HIGECO MORE ANSWERS THE MOST COMMON QUESTIONS ABOUT CCI<\/span><\/p><\/div>\n\n\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-35568ea\" id=\"faq\" data-block-id=\"35568ea\"><style>.stk-35568ea {margin-bottom:0px !important;}<\/style><h2 class=\"stk-block-heading__text has-text-align-left\">FAQ on the Central Plant Controller (CCI)<\/h2><\/div>\n\n\n\n<div class=\"wp-block-stackable-subtitle stk-block-subtitle stk-block stk-cbdf4fe\" data-block-id=\"cbdf4fe\"><style>.stk-cbdf4fe .stk-block-subtitle__text{font-size:24px !important;}@media screen and (max-width:999px){.stk-cbdf4fe .stk-block-subtitle__text{font-size:24px !important;}}<\/style><p class=\"stk-block-subtitle__text stk-subtitle\"><strong>Updated to ARERA Resolution 564\/2025\/R\/EEL, December 23, 2025<\/strong><\/p><\/div>\n\n\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-002b68c\" data-block-id=\"002b68c\"><p class=\"stk-block-text__text\">In this section, we&#8217;ve collected the most frequently asked questions about the CCI, which emerged during the<br\/><a href=\"https:\/\/youtu.be\/5QN1jQ31W7s?si=A3aeLr0D93eEWdTX\" target=\"_blank\" rel=\"noopener\">dedicated webinar<\/a> and other discussions with our customers. Here, you&#8217;ll find practical answers and regulatory references to clarify doubts and learn more about the operation of the Central Plant Controller. <\/p><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-4d1766c\" data-block-id=\"4d1766c\"><style>.stk-4d1766c {margin-bottom:0px !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-4d1766c-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-af70900\" data-v=\"4\" data-block-id=\"af70900\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-af70900-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-af70900-inner-blocks\">\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-86ceffa is-style-default\" data-block-id=\"86ceffa\"><style>.stk-86ceffa {border-top-left-radius:0px !important;border-top-right-radius:0px !important;border-bottom-right-radius:0px !important;border-bottom-left-radius:0px !important;overflow:hidden !important;padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;margin-bottom:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-66b9350 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"66b9350\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-66b9350-container stk-hover-parent\"><div class=\"stk-block-content stk-inner-blocks stk-66b9350-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-5241752\" data-block-id=\"5241752\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-01d3ec5\" id=\"campo-di-applicazione\" data-block-id=\"01d3ec5\"><h4 class=\"stk-block-heading__text\">Field of application<\/h4><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-dfe1ea8\" data-block-id=\"dfe1ea8\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-dfe1ea8\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-dfe-1-ea-8-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-dfe-1-ea-8-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-225f18c stk-block-accordion__content\" data-v=\"4\" data-block-id=\"225f18c\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-225f18c-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-225f18c-inner-blocks\">\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-5409941 is-style-plain\" data-block-id=\"5409941\"><style>.stk-5409941 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-b71dffa stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"b71dffa\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-b71dffa-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-b71dffa-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-4ac4f17\" data-block-id=\"4ac4f17\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-4581aa3\" id=\"per-quali-impianti-e-obbligatorio-il-cci\" data-block-id=\"4581aa3\"><h6 class=\"stk-block-heading__text\">For which systems is the CCI mandatory?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-8153d1a\" data-block-id=\"8153d1a\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-8153d1a\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-8153-d-1-a-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-8153-d-1-a-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-bd922bd stk-block-accordion__content\" data-v=\"4\" data-block-id=\"bd922bd\"><style>.stk-bd922bd-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-bd922bd-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-bd922bd-inner-blocks\">\n<p class=\"wp-block-paragraph\">Resolution 385\/25\/R\/eel, and the subsequent 564\/25\/R\/eel, positively verify revision 2 of Annex A72 to Terna&#8217;s Grid Code and consequently extend the scope of application of the CCI to photovoltaic and wind plants with a nominal power greater than or equal to 100kW, always connected to MT.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Plants with a nominal power greater than or equal to 100kW and less than 500kW are considered EXISTING if they were already connected to the grid on the date of publication of the resolution (August 6, 2025) or if they submitted a connection request before October 31, 2025.<br\/>Both plants with a nominal power greater than or equal to 500kW and less than 1MW, and those with a nominal power greater than 1MW, will be considered EXISTING if they were already connected to the grid on the date of publication of the resolution (August 6, 2025) or if they had already submitted a connection request before that date.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Power plants not included in the above definitions are considered NEW.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For EXISTING systems, the Resolution requires ADAPTATION, i.e. installation of the CCI, if not already present, and activation of the PF2 function for limiting Active Power upon external command from the DSO, within the deadlines indicated above.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For NEW systems, the Resolution requires the installation of the CCI and the activation of the PF2 function for limiting Active Power upon external command from the DSO, by the time of connection to the grid.<\/p>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-1e1c95a is-style-plain\" data-block-id=\"1e1c95a\"><style>.stk-1e1c95a {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-2b80c91 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"2b80c91\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-2b80c91-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-2b80c91-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-0d007dd\" data-block-id=\"0d007dd\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-db903d6\" id=\"per-quali-tecnologie-di-impianti-e-obbligatorio-il-cci\" data-block-id=\"db903d6\"><h6 class=\"stk-block-heading__text\">For which power plant technologies is CCI mandatory?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-fccc21e\" data-block-id=\"fccc21e\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-fccc21e\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-fccc-21-e-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-fccc-21-e-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-075f5cc stk-block-accordion__content\" data-v=\"4\" data-block-id=\"075f5cc\"><style>.stk-075f5cc-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-075f5cc-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-075f5cc-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-30060f0\" data-block-id=\"30060f0\"><p class=\"stk-block-text__text\">For power plants with a nominal power greater than or equal to 1 MW connected to medium voltage, the obligation remains valid for all technologies, without distinction.<br\/>For power plants with a nominal power less than 1 MW, also connected to medium voltage, the obligation applies only to photovoltaic and wind technologies.<br\/>In the future, it will likely be extended to other technologies as well, and ARERA will define the modalities with a dedicated resolution.<\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk-block stk-63ceaa6 is-style-plain\" data-block-id=\"63ceaa6\"><style>.stk-63ceaa6 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-d244a9a stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"d244a9a\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-d244a9a-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-d244a9a-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-113243e\" data-block-id=\"113243e\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-37a0416\" id=\"ho-ricevuto-la-comunicazione-di-adeguamento-del-cci-dal-dso-anche-per-impianti-fotovoltaici-con-potenza-nominale-minore-di-1-mw-perche\" data-block-id=\"37a0416\"><h6 class=\"stk-block-heading__text\">I received the CCI adjustment notice from the DSO even for photovoltaic systems with a nominal power of less than 1MW. Why?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-bbacf10\" data-block-id=\"bbacf10\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-bbacf10\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-bbacf-10-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-bbacf-10-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-f2742bd stk-block-accordion__content\" data-v=\"4\" data-block-id=\"f2742bd\"><style>.stk-f2742bd-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-f2742bd-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-f2742bd-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-74906ee\" data-block-id=\"74906ee\"><p class=\"stk-block-text__text\">If the system has a nominal power greater than or equal to 100kW, this is correct, as Resolution 385\/25 extends the requirement for photovoltaic systems up to 100kW.<br\/>If, however, the system has a lower nominal power, it could be an error due to incorrect or outdated data on Gaud\u00ec. You can report this to the DSO by replying to the certified email received. <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-0057f1a is-style-plain\" data-block-id=\"0057f1a\"><style>.stk-0057f1a {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-1f361b4 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"1f361b4\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-1f361b4-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-1f361b4-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-a0d4ba0\" data-block-id=\"a0d4ba0\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-f65e7d5\" id=\"per-quali-impianti-e-previsto-il-bonus\" data-block-id=\"f65e7d5\"><h6 class=\"stk-block-heading__text\">For which power plants is the bonus foreseen?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-1f086c5\" data-block-id=\"1f086c5\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-1f086c5\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-1-f-086-c-5-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-1-f-086-c-5-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-ae5d304 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"ae5d304\"><style>.stk-ae5d304-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-ae5d304-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-ae5d304-inner-blocks\">\n<p class=\"wp-block-paragraph\">Resolution 385\/25\/R\/eel, and the subsequent 564\/25\/R\/eel, establish the provision of a bonus for the adaptation of existing plants, but only those with a nominal power of less than 1 MW.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Existing systems with a nominal power of 100kW or more but less than 500kW will receive a financial contribution of:<br\/>&#8211; \u20ac7,500 if they submit the Compliance Declaration by January 31, 2027<br\/>&#8211; \u20ac6,000 if they submit the Compliance Declaration by March 31, 2027<br\/>&#8211; \u20ac3,000 if they submit the Compliance Declaration by June 30, 2027<br\/>&#8211; No financial bonus if they submit the Compliance Declaration after June 30, 2027 and before the mandatory deadline, i.e., March 31, 2028.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Existing plants with a nominal power greater than or equal to 500kW and less than 1MW will receive a financial contribution of:<br\/>&#8211; \u20ac1,000 if they submit the Compliance Declaration by December 31, 2026<br\/>&#8211; \u20ac8,000 if they submit the Compliance Declaration by February 28, 2027<br\/>&#8211; \u20ac4,000 if they submit the Compliance Declaration by May 31, 2027<br\/>&#8211; No financial bonus if they submit the Compliance Declaration after May 31, 2027 and before the mandatory deadline, i.e., December 31, 2027.<\/p>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-566781c is-style-plain\" data-block-id=\"566781c\"><style>.stk-566781c {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-284662b stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"284662b\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-284662b-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-284662b-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-95eb3c0\" data-block-id=\"95eb3c0\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-058c4f6\" id=\"per-impianti-tra-i-6-mw-e-i-10-mw-esistono-delle-misure-specifiche\" data-block-id=\"058c4f6\"><h6 class=\"stk-block-heading__text\">Are there specific measures for systems between 6 MW and 10 MW?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-4b59689\" data-block-id=\"4b59689\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-4b59689\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-4-b-59689-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-4-b-59689-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-19bdbdc stk-block-accordion__content\" data-v=\"4\" data-block-id=\"19bdbdc\"><style>.stk-19bdbdc-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-19bdbdc-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-19bdbdc-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-55544d6\" data-block-id=\"55544d6\"><p class=\"stk-block-text__text\">Revision 4 of CEI 0-16, published in 2025, eliminated Annexes K and X, referring directly to the Terna Grid Code for HV-connected systems: Annex A68 for photovoltaic systems, A79 for storage systems, and A17 for wind systems. For MV-connected systems with a power greater than 6 MW, the same requirements apply as for smaller MV-connected systems. <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-050b762 is-style-plain\" data-block-id=\"050b762\"><style>.stk-050b762 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-5ea30f4 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"5ea30f4\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-5ea30f4-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-5ea30f4-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-7fd4970\" data-block-id=\"7fd4970\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-6d13cb8\" id=\"gli-impianti-in-autoconsumo-senza-immissione-di-energia-nella-rete-elettrica-sono-inclusi\" data-block-id=\"6d13cb8\"><h6 class=\"stk-block-heading__text\">Are self-consumption systems without feeding energy into the electricity grid included?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-ffe4186\" data-block-id=\"ffe4186\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-ffe4186\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-ffe-4186-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-ffe-4186-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-53bd81f stk-block-accordion__content\" data-v=\"4\" data-block-id=\"53bd81f\"><style>.stk-53bd81f-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-53bd81f-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-53bd81f-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-12c6fe2\" data-block-id=\"12c6fe2\"><p class=\"stk-block-text__text\">Yes. The scope of application is defined based on the nominal power of the system, calculated as defined by the CEI 0-16 standard, not on the maximum grid feed-in power.<br\/>Specifically, for photovoltaic systems, the nominal power must be calculated as the sum of the lower of the AC and DC power of each inverter. <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-f496d2c is-style-plain\" data-block-id=\"f496d2c\"><style>.stk-f496d2c {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-f250246 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"f250246\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-f250246-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-f250246-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-eb12f48\" data-block-id=\"eb12f48\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-8619079\" id=\"per-gli-impianti-in-fase-di-costruzione-e-necessario-installare-sia-il-modem-del-teledistacco-che-il-cci\" data-block-id=\"8619079\"><h6 class=\"stk-block-heading__text\">For power plants under construction, is it necessary to install both the remote disconnection modem and the CCI?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-24391a1\" data-block-id=\"24391a1\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-24391a1\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-24391-a-1-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-24391-a-1-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-8fa37db stk-block-accordion__content\" data-v=\"4\" data-block-id=\"8fa37db\"><style>.stk-8fa37db-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-8fa37db-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-8fa37db-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-a85d9a3\" data-block-id=\"a85d9a3\"><p class=\"stk-block-text__text\">Yes, in the transitional phase, that is from the publication of the Resolution until the deadlines indicated for the definition of existing plants, it is necessary to install both.<br\/>In general, for existing systems, it is necessary for the remote disconnection modem to remain functional until the completion of the upgrade, in particular until the functional checks of the DSO have been passed.<\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-3ce962d is-style-plain\" data-block-id=\"3ce962d\"><style>.stk-3ce962d {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-cfc6a3e stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"cfc6a3e\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-cfc6a3e-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-cfc6a3e-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-d5b227a\" data-block-id=\"d5b227a\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-ecd4288\" id=\"lenergia-persa-in-seguito-a-un-comando-di-limitazione-della-potenza-attiva-da-parte-del-dso-verra-rimborsata\" data-block-id=\"ecd4288\"><h6 class=\"stk-block-heading__text\">Will the energy lost following an active power limitation command from the DSO be refunded?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-6ef92e1\" data-block-id=\"6ef92e1\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-6ef92e1\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-6-ef-92-e-1-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-6-ef-92-e-1-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-89cb013 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"89cb013\"><style>.stk-89cb013-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-89cb013-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-89cb013-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-fc6ae77\" data-block-id=\"fc6ae77\"><p class=\"stk-block-text__text\">Yes, as indicated in the TIDE, but only for the portion of energy sold. Any incentive will not be reimbursed, as it is allocated to the energy PRODUCED, which in this case was not generated. <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-43d1eef is-style-plain\" data-block-id=\"43d1eef\"><style>.stk-43d1eef {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-3f61dad stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"3f61dad\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-3f61dad-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-3f61dad-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-5f70396\" data-block-id=\"5f70396\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-560f8c4\" id=\"il-cci-e-obbligatorio-anche-per-impianti-ibridi-per-esempio-fotovoltaico-e-accumulo-nel-caso-come-si-calcola-la-potenza-nominale\" data-block-id=\"560f8c4\"><h6 class=\"stk-block-heading__text\">Is the CCI also mandatory for hybrid systems, such as photovoltaic and storage? If so, how is the nominal power calculated? <\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-0c97099\" data-block-id=\"0c97099\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-0c97099\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-0-c-97099-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-0-c-97099-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-526c654 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"526c654\"><style>.stk-526c654-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-526c654-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-526c654-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-354303a\" data-block-id=\"354303a\"><p class=\"stk-block-text__text\">Yes, it is. For hybrid systems, i.e., systems with multiple technologies, the definition of a system in the TICA is considered for applicability: a system is defined as a group of generators, of the same technology, connected under the same POD.<br\/>The CCI is mandatory if under a MT POD there is at least one system with a nominal power greater than or equal to 1MW, or if there is a photovoltaic or wind system with a nominal power greater than or equal to 100kW. In this second case, the PF2 Active Power Limitation function must also be activated upon external command from the DSO.  <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n<\/div><\/div><\/div>\n<\/details>\n<\/div><\/div><\/div>\n<\/div><\/div>\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-b8d5417 is-style-default\" data-block-id=\"b8d5417\"><style>.stk-b8d5417 {border-top-left-radius:0px !important;border-top-right-radius:0px !important;border-bottom-right-radius:0px !important;border-bottom-left-radius:0px !important;overflow:hidden !important;padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;margin-bottom:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-c269b6b stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"c269b6b\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-c269b6b-container stk-hover-parent\"><div class=\"stk-block-content stk-inner-blocks stk-c269b6b-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-8d7b61b\" data-block-id=\"8d7b61b\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-9e32802\" id=\"funzionalita-del-cci\" data-block-id=\"9e32802\"><h4 class=\"stk-block-heading__text\">CCI Features<\/h4><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-11a76c2\" data-block-id=\"11a76c2\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-11a76c2\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-11-a-76-c-2-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-11-a-76-c-2-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-d9f086e stk-block-accordion__content\" data-v=\"4\" data-block-id=\"d9f086e\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-d9f086e-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-d9f086e-inner-blocks\">\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-ae5dc9f is-style-plain\" data-block-id=\"ae5dc9f\"><style>.stk-ae5dc9f {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-4c72030 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"4c72030\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-4c72030-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-4c72030-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-ad8ab0f\" data-block-id=\"ad8ab0f\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-5b41933\" id=\"che-funzionalita-deve-avere-il-cci-sono-tutte-obbligatorie\" data-block-id=\"5b41933\"><h6 class=\"stk-block-heading__text\">What functions must the CCI have? Are they all mandatory? <\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-7fd8259\" data-block-id=\"7fd8259\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-7fd8259\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-7-fd-8259-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-7-fd-8259-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-1edb692 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"1edb692\"><style>.stk-1edb692-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-1edb692-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-1edb692-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-7496d51\" data-block-id=\"7496d51\"><p class=\"stk-block-text__text\">Yes, to be compliant with CEI 0-16, the CCI must have all the functionalities defined in Annexes O and T: the functional performances <strong>PF1<\/strong>, relating to observability, <strong>PF2<\/strong>, relating to controllability by the DSO, and <strong>PF3<\/strong>, relating to controllability by the aggregator\/bsp.<\/p><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Arera Resolutions 540\/21 and 385\/25 establish whether or not the activation of various functions on systems is mandatory.<br\/>Resolution 385\/25 establishes the mandatory activation of the PF2 Active Power Limitation function upon external command from the DSO for photovoltaic and wind systems connected to medium voltage with a nominal power greater than or equal to 100 kW.<\/p>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-a581d61 is-style-plain\" data-block-id=\"a581d61\"><style>.stk-a581d61 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-ef44fd1 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"ef44fd1\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-ef44fd1-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-ef44fd1-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-b46b9eb\" data-block-id=\"b46b9eb\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-b53fb81\" id=\"sara-il-distributore-ad-indicare-quali-impianti-nuovi-dovranno-avere-anche-i-controlli-di-p-e-q\" data-block-id=\"b53fb81\"><h6 class=\"stk-block-heading__text\">Will the distributor indicate which new power plants will also have P and Q controls?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-b30d22b\" data-block-id=\"b30d22b\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-b30d22b\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-b-30-d-22-b-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-b-30-d-22-b-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-b82c3cc stk-block-accordion__content\" data-v=\"4\" data-block-id=\"b82c3cc\"><style>.stk-b82c3cc-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-b82c3cc-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-b82c3cc-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-81eaded\" data-block-id=\"81eaded\"><p class=\"stk-block-text__text\">Yes, in addition to the PF2 Active Power Limitation function upon external DSO command, which must be activated on all MV-connected photovoltaic and wind power systems with a nominal power greater than or equal to 100kW, when defining the Operating Regulations, the DSO can request the activation of other specific PF2 functions. The Producer can always refuse, but these functions are not mandatory. <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk-block stk-e62b4a8 is-style-plain\" data-block-id=\"e62b4a8\"><style>.stk-e62b4a8 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-3dc7fb5 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"3dc7fb5\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-3dc7fb5-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-3dc7fb5-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-5a7db1e\" data-block-id=\"5a7db1e\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-3328da6\" id=\"la-sincronizzazione-oraria-tramite-ntp-e-compatibile-con-allegato-o\" data-block-id=\"3328da6\"><h6 class=\"stk-block-heading__text\">Is NTP time synchronization compliant with Annex O?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-968d052\" data-block-id=\"968d052\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-968d052\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-968-d-052-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-968-d-052-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-cd56bd1 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"cd56bd1\"><style>.stk-cd56bd1-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-cd56bd1-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-cd56bd1-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-acd018f\" data-block-id=\"acd018f\"><p class=\"stk-block-text__text\">No, it remains invalid as previously.<br\/>Annexes O and T state that the time synchronization function can be performed by a GPS receiver integrated into the CCI, or it can be provided via a local communications network service, using the NTS protocol, the secure version of NTP.<\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-355933b is-style-plain\" data-block-id=\"355933b\"><style>.stk-355933b {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-450c311 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"450c311\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-450c311-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-450c311-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-a8cfda9\" data-block-id=\"a8cfda9\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-a204d4d\" id=\"chi-fornisce-la-connettivita-e-gli-apparati-per-il-cci-il-dso-o-il-produttore\" data-block-id=\"a204d4d\"><h6 class=\"stk-block-heading__text\">Who provides the connectivity and equipment for the CCI? The DSO or the manufacturer? <\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-6ebce91\" data-block-id=\"6ebce91\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-6ebce91\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-6-ebce-91-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-6-ebce-91-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-952b300 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"952b300\"><style>.stk-952b300-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-952b300-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-952b300-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-8ae3f3e\" data-block-id=\"8ae3f3e\"><p class=\"stk-block-text__text\">The DSO, as required by Resolution 540\/21.<br\/>The battery limit, between the DSO&#8217;s scope of supply and that of the Manufacturer, is the optical cassette that the DSO installs in the measurement compartment of the Secondary (exchange) cabin.<\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-991fa96 is-style-plain\" data-block-id=\"991fa96\"><style>.stk-991fa96 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-3d2a392 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"3d2a392\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-3d2a392-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-3d2a392-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-1235efd\" data-block-id=\"1235efd\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-8780daf\" id=\"il-cci-deve-essere-connesso-a-internet\" data-block-id=\"8780daf\"><h6 class=\"stk-block-heading__text\">Does the CCI need to be connected to the internet?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-37e5c6e\" data-block-id=\"37e5c6e\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-37e5c6e\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-37-e-5-c-6-e-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-37-e-5-c-6-e-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-cc832ca stk-block-accordion__content\" data-v=\"4\" data-block-id=\"cc832ca\"><style>.stk-cc832ca-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-cc832ca-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-cc832ca-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-0f76ea5\" data-block-id=\"0f76ea5\"><p class=\"stk-block-text__text\">It better be. In fact, the CCI must use a PKI (Public Key Infrastructure) for the management of security certificates (See CEI 0-16 T.3.3.4.9). According to Annex T there are 3 ways to do it:  <br\/><strong>1 \u2013 Manual Management (temporary solution only)<\/strong>: Installations, updates, revocations, replacements, of DSO certificates and any BSPs must be done manually on each plant. Challenging and error-prone if there are many CCIs to manage. <br\/><strong>2 \u2013 Local PKI in the plant and OCSP protocol<\/strong>: Installing and managing a local PKI is very expensive and difficult. It is neither convenient nor secure. <br\/><strong>3 \u2013 External PKI in CLOUD<\/strong>: The CCI uses an external PKI in #cloud, through the internet connection. Secure, centralized and automatic management of the certificate life cycle.<br\/>In addition, a CCI connected to the internet is easier to update \u2013 mandatory updates are already planned in the coming years \u2013 to reach and consult \u2013 through our portal \u2013 to replace in case of failure \u2013 automatic backup of configurations and data. <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n<\/div><\/div><\/div>\n<\/details>\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-77de8b4 is-style-default\" data-block-id=\"77de8b4\"><style>.stk-77de8b4 {border-top-left-radius:0px !important;border-top-right-radius:0px !important;border-bottom-right-radius:0px !important;border-bottom-left-radius:0px !important;overflow:hidden !important;padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;margin-bottom:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-8cc4dc3 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"8cc4dc3\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-8cc4dc3-container stk-hover-parent\"><div class=\"stk-block-content stk-inner-blocks stk-8cc4dc3-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-ce4e696\" data-block-id=\"ce4e696\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-3bf73fe\" id=\"misure-e-raccolta-segnali\" data-block-id=\"3bf73fe\"><h4 class=\"stk-block-heading__text\">Measurements and signal collection<\/h4><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-5a3dbd1\" data-block-id=\"5a3dbd1\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-5a3dbd1\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-5-a-3-dbd-1-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-5-a-3-dbd-1-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-d059514 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"d059514\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-d059514-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-d059514-inner-blocks\">\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-de8b2ee is-style-plain\" data-block-id=\"de8b2ee\"><style>.stk-de8b2ee {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-cc96cc8 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"cc96cc8\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-cc96cc8-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-cc96cc8-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-3d288e9\" data-block-id=\"3d288e9\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-d832064\" id=\"che-dati-devono-essere-raccolti-dal-cci\" data-block-id=\"d832064\"><h6 class=\"stk-block-heading__text\">What data must be collected by the CCI?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-7bf08c3\" data-block-id=\"7bf08c3\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-7bf08c3\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-7-bf-08-c-3-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-7-bf-08-c-3-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-9c4b41a stk-block-accordion__content\" data-v=\"4\" data-block-id=\"9c4b41a\"><style>.stk-9c4b41a-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-9c4b41a-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-9c4b41a-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-9585413\" data-block-id=\"9585413\"><p class=\"stk-block-text__text\">The data to be collected by the CCI remains essentially unchanged from the past.<br\/>For <strong>Delivery Points<\/strong>, the CCI must directly measure P, Q, V, and optionally I, and acquire the status of the DG and DI.<br\/>For <strong>Single Generators<\/strong>, the CCI must acquire the P measurement and the status of the DDG (or equivalent).<\/p><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Individual generator data<\/strong> is required only for new systems with a power output greater than or equal to 1 MW, and only if the generators have a nominal power greater than:<br\/>&#8211; 170kW for static converters (e.g., photovoltaic inverters)<br\/>&#8211; 250kW for traditional generators<br\/>&#8211; 50kW for storage<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Furthermore, among the simplifications introduced by the CEI <strong>for power plants with a nominal power of less than 500 kW<\/strong>, it is established that:<br\/>&#8211; for fully sold and single-source plants only, the aggregate generated power can be assimilated to the power fed into the grid, measuring only the latter.<br\/>&#8211; the maximum allowable error for measurements increases from 2.2% to 5%.<\/p>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-0d30929 is-style-plain\" data-block-id=\"0d30929\"><style>.stk-0d30929 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-c2feea8 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"c2feea8\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-c2feea8-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-c2feea8-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-c5f28b4\" data-block-id=\"c5f28b4\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-5b49d62\" id=\"come-devono-essere-realizzate-le-misure-di-p-q-e-v-al-punto-di-consegna\" data-block-id=\"5b49d62\"><h6 class=\"stk-block-heading__text\">How should the P, Q and V measurements be made at the delivery point?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-969dab4\" data-block-id=\"969dab4\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-969dab4\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-969-dab-4-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-969-dab-4-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-8274694 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"8274694\"><style>.stk-8274694-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-8274694-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-8274694-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-5f08ae7\" data-block-id=\"5f08ae7\"><p class=\"stk-block-text__text\">The CEI 0-16 standard requires that MV measurements must be taken at the point of delivery directly by the CCI using its measurement unit.<br\/>The standard recommends using a Class 0.2 or better Measurement Converter and Class 0.5 or better CTs and VTs, with a rating of 5 VA or 10 VA. The CTs and VTs can be shared with other systems, excluding the fiscal measurement group, without creating interference.<\/p><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Measurement systems with different characteristics are also acceptable, provided they comply with the accuracy required by Annex A.6 of the Terna Network Code, table 5: maximum error in the measurement of P, Q and V less than 2.2%, which increases to 5% for systems with nominal power less than 500kW.<\/p>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk-block stk-3b6ec6b is-style-plain\" data-block-id=\"3b6ec6b\"><style>.stk-3b6ec6b {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-d557757 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"d557757\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-d557757-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-d557757-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-22bc6cd\" data-block-id=\"22bc6cd\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-3515b9d\" id=\"le-misure-e-gli-stati-devono-essere-acquisiti-direttamente-dal-cci\" data-block-id=\"3515b9d\"><h6 class=\"stk-block-heading__text\">Must measurements and statuses be acquired directly from the CCI?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-dafbf8d\" data-block-id=\"dafbf8d\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-dafbf8d\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-dafbf-8-d-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-dafbf-8-d-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-50df45e stk-block-accordion__content\" data-v=\"4\" data-block-id=\"50df45e\"><style>.stk-50df45e-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-50df45e-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-50df45e-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-2408d23\" data-block-id=\"2408d23\"><p class=\"stk-block-text__text\">The CEI 0-16 standard specifies that the measurements and statuses of individual generators, and the measurements of the aggregate generated power, can also be acquired by the CCI via communication with other system elements, using standard communication protocols, provided that the required accuracy is guaranteed.<\/p><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">For delivery point measurements, however, the law establishes that they be acquired directly from the CCI.<\/p>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-afa24a0 is-style-plain\" data-block-id=\"afa24a0\"><style>.stk-afa24a0 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-2510c67 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"2510c67\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-2510c67-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-2510c67-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-afe76fc\" data-block-id=\"afe76fc\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-ea43374\" id=\"posso-leggere-le-misure-di-tensione-dalla-pi-e-di-corrente-dalla-pg\" data-block-id=\"ea43374\"><h6 class=\"stk-block-heading__text\">Can I read voltage measurements from the PI and current from the PG?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-47e64ec\" data-block-id=\"47e64ec\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-47e64ec\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-47-e-64-ec-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-47-e-64-ec-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-3653bf9 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"3653bf9\"><style>.stk-3653bf9-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-3653bf9-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-3653bf9-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-4ae1954\" data-block-id=\"4ae1954\"><p class=\"stk-block-text__text\">No, because the protectors use protective CTs, which cannot guarantee the required accuracy.<\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-8bbf127 is-style-plain\" data-block-id=\"8bbf127\"><style>.stk-8bbf127 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-13f157c stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"13f157c\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-13f157c-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-13f157c-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-8cb9e94\" data-block-id=\"8cb9e94\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-a1d0bb6\" id=\"nel-mio-impianto-tramite-un-anello-in-fibra-ottica-sono-collegate-6-protezioni-di-interfaccia-una-per-cabina-di-protezione-devo-controllare-singolarmente-tutte-le-spi-o-e-sufficiente-monitorare-lo-stato-del-solo-dispositivo-di-interfaccia-generale\" data-block-id=\"a1d0bb6\"><h6 class=\"stk-block-heading__text\">In my system, 6 interface protections are connected via a fiber optic ring (one for each protection cabin). Do I have to control all the SPIs individually or is it sufficient to monitor the status of the general interface device only? <\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-a6e6e87\" data-block-id=\"a6e6e87\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-a6e6e87\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-a-6-e-6-e-87-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-a-6-e-6-e-87-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-7b5200c stk-block-accordion__content\" data-v=\"4\" data-block-id=\"7b5200c\"><style>.stk-7b5200c-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-7b5200c-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-7b5200c-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-675da03\" data-block-id=\"675da03\"><p class=\"stk-block-text__text\">As indicated in paragraph O.14 and in figures O.1 and O.7 of CEI-016 2025-04, monitoring of the status of the DG and all the DIs is required, through direct acquisition (clean contact) or by communicating with other system elements (e.g. SPI).<\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-0974597 is-style-plain\" data-block-id=\"0974597\"><style>.stk-0974597 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-974cd30 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"974cd30\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-974cd30-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-974cd30-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-1d2139e\" data-block-id=\"1d2139e\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-65ea5ce\" id=\"nell-allegato-o-della-cei-0-16-sono-richiesti-ove-possibile-ta-e-tv-con-prestazioni-da-5-o-10-va-considerato-che-certi-impianti-da-adeguare-con-il-cci-sono-disponibili-ta-e-tv-con-prestazioni-di-15-va-possono-andare-bene-ugualmente\" data-block-id=\"65ea5ce\"><h6 class=\"stk-block-heading__text\">In Annex O of CEI 0-16, where possible, CTs and TVs with performances of 5 or 10 VA are required. Considering that certain systems to be adapted with the CCI are available with CTs and TVs with performances of 15 VA, can they be equally good? <\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-2e3cb8d\" data-block-id=\"2e3cb8d\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-2e3cb8d\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-2-e-3-cb-8-d-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-2-e-3-cb-8-d-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-66b95d2 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"66b95d2\"><style>.stk-66b95d2-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-66b95d2-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-66b95d2-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-4e7c5da\" data-block-id=\"4e7c5da\"><p class=\"stk-block-text__text\">Yes, as indicated in the interpretative note published by the CEI in July 2023.<\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-da6366c is-style-plain\" data-block-id=\"da6366c\"><style>.stk-da6366c {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-86e16c7 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"86e16c7\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-86e16c7-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-86e16c7-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-37f4145\" data-block-id=\"37f4145\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-3089b32\" id=\"in-caso-di-rinuncia-del-dso-a-chi-mando-i-dati-e-come\" data-block-id=\"3089b32\"><h6 class=\"stk-block-heading__text\">In case of DSO waiver, to whom do I send the data and how?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-b58cf74\" data-block-id=\"b58cf74\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-b58cf74\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-b-58-cf-74-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-b-58-cf-74-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-663337b stk-block-accordion__content\" data-v=\"4\" data-block-id=\"663337b\"><style>.stk-663337b-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-663337b-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-663337b-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-ca6928f\" data-block-id=\"ca6928f\"><p class=\"stk-block-text__text\">Resolution 540\/21\/R\/el establishes that DSOs that do not intend to carry out data collection and regulation activities may use a third-party distributor, &#8220;<em>such as, for example, the reference distribution companies or, in the case of SDC, the concessionary distribution companies in the territory in which they operate<\/em>&#8220;. Alternatively, the DSO could submit a communication of motivated renunciation to Terna by 31 January 2022, which will evaluate alternative solutions. Ultimately, Terna will carry out the data collection directly, via the IEC 60870-104 protocol.  <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-7815605 is-style-plain\" data-block-id=\"7815605\"><style>.stk-7815605 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-a213960 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"a213960\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-a213960-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-a213960-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-d29fe2e\" data-block-id=\"d29fe2e\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-70119ce\" id=\"posso-installare-sonde-rogowski-al-posto-dei-ta-di-misura-indicati-dalla-cei-0-16-per-il-mio-cci\" data-block-id=\"70119ce\"><h6 class=\"stk-block-heading__text\">Can I install Rogowski probes instead of the measuring CTs, indicated by CEI 0-16, for my CCI?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-18ab181\" data-block-id=\"18ab181\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-18ab181\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-18-ab-181-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-18-ab-181-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-8a33d62 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"8a33d62\"><style>.stk-8a33d62-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-8a33d62-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-8a33d62-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-f8a5d5e\" data-block-id=\"f8a5d5e\"><p class=\"stk-block-text__text\">Yes, CTs are not the only measurement system available. You can also use Rogowski probes, but be careful because they are not as precise as CTs, and the CEI 0-16 standard requires that a total measurement error on P and Q be guaranteed to be less than 2.2%! <br\/>If you choose CTs measuring in class 0.5, as indicated in CEI 0-16, you will be able to avoid additional tests and compliance problems.<\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-400ef2e is-style-plain\" data-block-id=\"400ef2e\"><style>.stk-400ef2e {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-853c317 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"853c317\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-853c317-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-853c317-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-7eabb69\" data-block-id=\"7eabb69\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-8e9eaa7\" id=\"per-prelevare-il-segnale-di-tensione-al-pd-c-in-mt-si-possono-usare-i-tv-usati-per-la-misura-della-minima-tensione-omopolare\" data-block-id=\"8e9eaa7\"><h6 class=\"stk-block-heading__text\">To collect the voltage signal at the PdC in MT, can the TVs used for measuring the Minimum Homopolar Voltage be used?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-176cf82\" data-block-id=\"176cf82\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-176cf82\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-176-cf-82-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-176-cf-82-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-ae82148 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"ae82148\"><style>.stk-ae82148-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-ae82148-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-ae82148-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-e490c3e\" data-block-id=\"e490c3e\"><p class=\"stk-block-text__text\">Yes. The CEI 0-16 standard establishes that the TVs for measuring the Minimum Homopolar Voltage must always be installed in MV at the connection point, and can be equipped with a double secondary (one for protection and one for measurement), or a single secondary with a double class (protection and measurement). <\/p><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">In the first case, the CCI can be connected to the measurement windings, even in parallel with other systems already connected.<br\/>In the second case, the CCI can be connected to the secondaries already connected in open delta to the Interface Protection, creating a separate connection to each VT. This way, it is always possible to take the three Phase-Earth voltages, without interfering with the measurement of the Minimum Homopolar Voltage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In any case, the requirement regarding the maximum measurement error must always be respected, which must be less than 2.2%, or 5% only for systems with a nominal power of less than 500kW.<\/p>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-e2a148c is-style-plain\" data-block-id=\"e2a148c\"><style>.stk-e2a148c {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-8abb069 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"8abb069\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-8abb069-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-8abb069-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-d16e1cb\" data-block-id=\"d16e1cb\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-24c6999\" id=\"e-necessario-che-il-cci-acquisisca-lintervento-del-modem-gsm-del-teledistacco-previsto-dall-allegato-m-della-norma-cei-0-16\" data-block-id=\"24c6999\"><h6 class=\"stk-block-heading__text\">Is it necessary for the CCI to acquire the intervention signal of the GSM modem used for remote disconnection, as required by Annex M of the CEI 0-16 standard?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-77224d4\" data-block-id=\"77224d4\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-77224d4\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-77224-d-4-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-77224-d-4-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-5c01998 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"5c01998\"><style>.stk-5c01998-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-5c01998-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-5c01998-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-6c67536\" data-block-id=\"6c67536\"><p class=\"stk-block-text__text\">Yes, the status of the GSM modem for remote disconnection is one of the signals that the CCI is required to acquire mandatorily. Although it is not included in the observability dataset, it is among the signals required by Chapter 14 of Annex O (\u201cData Logger\u201d). The intervention signal must be acquired during the transitional phase, in which the modem must remain operational, until the completion of the verification process with the DSO concerning the CCI and the active power limitation function via external command (Rigedi). <br\/>Key points for correct management:<\/p><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Modem removal<\/strong>: Monitoring of this component remains necessary until the modem can be removed. Such removal is subject to the completion of the verifications carried out by the DSO (Distribution System Operator) regarding the effective operability of the CCI with the Active Power Limitation function PF2 enabled. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Regulatory requirement<\/strong>: According to the current A72 Rev.2 and Resolution 385\/25, the CCI is required to monitor the intervention of the remote disconnection modem (Annex M).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Acquisition method: The modem status can be acquired via digital contacts or through a communication protocol, either directly from the modem itself or from the interface protection device.<\/p>\n<\/div><\/div><\/div>\n<\/details>\n<\/div><\/div><\/div>\n<\/details>\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-f149b68 is-style-default\" data-block-id=\"f149b68\"><style>.stk-f149b68 {border-top-left-radius:0px !important;border-top-right-radius:0px !important;border-bottom-right-radius:0px !important;border-bottom-left-radius:0px !important;overflow:hidden !important;padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;margin-bottom:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-40fc416 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"40fc416\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-40fc416-container stk-hover-parent\"><div class=\"stk-block-content stk-inner-blocks stk-40fc416-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-de47b25\" data-block-id=\"de47b25\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-efe92e5\" id=\"regolazione-e-controllo\" data-block-id=\"efe92e5\"><h4 class=\"stk-block-heading__text\">Regulation and control<\/h4><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-f9e0962\" data-block-id=\"f9e0962\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-f9e0962\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-f-9-e-0962-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-f-9-e-0962-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-14afb90 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"14afb90\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-14afb90-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-14afb90-inner-blocks\">\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-ae05234 is-style-plain\" data-block-id=\"ae05234\"><style>.stk-ae05234 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-e4fe961 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"e4fe961\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-e4fe961-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-e4fe961-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-ae020da\" data-block-id=\"ae020da\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-311154a\" id=\"come-fa-il-cci-a-controllare-limpianto-ci-sono-dei-requisiti\" data-block-id=\"311154a\"><h6 class=\"stk-block-heading__text\">How does the CCI control the plant? Are there any requirements? <\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-e77f273\" data-block-id=\"e77f273\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-e77f273\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-e-77-f-273-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-e-77-f-273-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-066aaf5 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"066aaf5\"><style>.stk-066aaf5-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-066aaf5-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-066aaf5-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-2885131\" data-block-id=\"2885131\"><p class=\"stk-block-text__text\">The CCI control functions are based on closed-loop regulators, which read the measurements at the delivery point, compare them with the set points, received (servo mode) or calculated (autonomous mode), calculate the set points to be sent to the generators\/converters and send them. Consequently, the CCI must be able to communicate reliably and quickly with the generators\/converters, which must implement a standard communication interface and protocol that includes the possibility of receiving commands in P and Q (or equivalent, for example PF or PHI). If the communication is based on serial protocols, such as RS485 or CANBUS, and not Ethernet, it is more difficult to respect the prescribed response times, and it is necessary to evaluate the feasibility on a case-by-case basis.  <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-eeb6bf8 is-style-plain\" data-block-id=\"eeb6bf8\"><style>.stk-eeb6bf8 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-2a377ab stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"2a377ab\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-2a377ab-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-2a377ab-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-8c96d8b\" data-block-id=\"8c96d8b\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-c30487e\" id=\"su-impianti-fotovoltaici-esistenti-se-gli-inverter-sono-molto-vecchi-e-o-di-aziende-fallite-come-si-puo-regolare-il-sistema\" data-block-id=\"c30487e\"><h6 class=\"stk-block-heading__text\">On existing photovoltaic systems, if the inverters are very old and\/or from bankrupt companies, how can the system be adjusted?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-30234aa\" data-block-id=\"30234aa\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-30234aa\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-30234-aa-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-30234-aa-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-4069fd2 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"4069fd2\"><style>.stk-4069fd2-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-4069fd2-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-4069fd2-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-3e53b52\" data-block-id=\"3e53b52\"><p class=\"stk-block-text__text\">Many photovoltaic inverter models, even older ones, are already designed to be controlled by an external control system, meaning they support receiving commands via standard communication protocols to regulate active and reactive power. Sometimes, it may be necessary to update the inverter&#8217;s firmware, or install an additional internal card or external data logger. <\/p><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">In the case of the active power limitation function, if the inverters cannot be regulated at all, the CCI can implement the command by disconnecting the individual inverters, i.e. by partially reducing production, while still keeping the system connected to the grid, i.e. by keeping the DI and DG closed.<\/p>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk-block stk-1a4309a is-style-plain\" data-block-id=\"1a4309a\"><style>.stk-1a4309a {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-486fcc0 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"486fcc0\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-486fcc0-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-486fcc0-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-33ade41\" data-block-id=\"33ade41\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-4dce902\" id=\"come-si-puo-regolare-un-impianto-formato-da-generatori-tradizionali\" data-block-id=\"4dce902\"><h6 class=\"stk-block-heading__text\">How can a system consisting of traditional generators be regulated?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-98a9653\" data-block-id=\"98a9653\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-98a9653\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-98-a-9653-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-98-a-9653-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-ac4660d stk-block-accordion__content\" data-v=\"4\" data-block-id=\"ac4660d\"><style>.stk-ac4660d-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-ac4660d-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-ac4660d-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-86f4702\" data-block-id=\"86f4702\"><p class=\"stk-block-text__text\">Similar to photovoltaic inverters, traditional generators can also be regulated by sending active and reactive power commands, directly or through an external controller (e.g., PLC).<br\/>Even for traditional generators, in the case of the active power limitation function, if the generators cannot be regulated at all, the CCI can implement the command by disconnecting the individual generators, i.e., partially reducing production, while still keeping the system connected to the grid, i.e., by keeping the DI and DG closed.<\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk-block stk-e9f9bca is-style-plain\" data-block-id=\"e9f9bca\"><style>.stk-e9f9bca {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-dbd1e2d stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"dbd1e2d\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-dbd1e2d-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-dbd1e2d-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-15242e6\" data-block-id=\"15242e6\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-7ac6198\" id=\"il-cci-puo-comunicare-con-i-generatori-inverter-attraverso-a-un-sistema-di-monitoraggio-gia-presente-in-impianto\" data-block-id=\"7ac6198\"><h6 class=\"stk-block-heading__text\">Can the CCI communicate with the generators\/inverters through a monitoring system already present in the power plant?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-e35ff80\" data-block-id=\"e35ff80\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-e35ff80\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-e-35-ff-80-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-e-35-ff-80-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-685635a stk-block-accordion__content\" data-v=\"4\" data-block-id=\"685635a\"><style>.stk-685635a-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-685635a-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-685635a-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-e912b52\" data-block-id=\"e912b52\"><style>.stk-e912b52 {margin-bottom:0px !important;}<\/style><p class=\"stk-block-text__text\">Yes. Annex O of the CEI 0-16 standard does not impose requirements on how the CCI is connected to generators\/inverters.<br\/>In any case, the connection must ensure compliance with the standard&#8217;s requirements, in particular: <\/p><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reliability: The CCI, and some of its features, must be available 99% of the time annually.<\/li>\n\n\n\n<li>Performance: the CCI must be able to collect data from individual generators, if requested, with a maximum sampling time of 4 seconds, and the response time of the control functions must be less than 1 minute for active power regulation, including Active Power Limitation upon external command from the DSO (required by Resolution 385\/25), and 10 seconds for reactive power regulation.<\/li>\n<\/ul>\n<\/div><\/div><\/div>\n<\/details>\n<\/div><\/div><\/div>\n<\/details>\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-3fb1753 is-style-default\" data-block-id=\"3fb1753\"><style>.stk-3fb1753 {border-top-left-radius:0px !important;border-top-right-radius:0px !important;border-bottom-right-radius:0px !important;border-bottom-left-radius:0px !important;overflow:hidden !important;padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;margin-bottom:40px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-2e6aa89 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"2e6aa89\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-2e6aa89-container stk-hover-parent\"><div class=\"stk-block-content stk-inner-blocks stk-2e6aa89-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-b9c6898\" data-block-id=\"b9c6898\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-91eecbe\" id=\"prove-e-certificazioni\" data-block-id=\"91eecbe\"><h4 class=\"stk-block-heading__text\">Tests and certifications<\/h4><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-f9765ac\" data-block-id=\"f9765ac\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-f9765ac\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-f-9765-ac-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-f-9765-ac-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-3c8f7bd stk-block-accordion__content\" data-v=\"4\" data-block-id=\"3c8f7bd\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-3c8f7bd-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-3c8f7bd-inner-blocks\">\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-72913ff is-style-plain\" data-block-id=\"72913ff\"><style>.stk-72913ff {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-7df2aba stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"7df2aba\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-7df2aba-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-7df2aba-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-c882aba\" data-block-id=\"c882aba\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-9a07d89\" id=\"la-certificazione-del-c-ci-da-chi-deve-essere-eseguita-deve-essere-fatta-da-un-soggetto-terzo\" data-block-id=\"9a07d89\"><h6 class=\"stk-block-heading__text\">Who must perform the CCi certification? Must it be done by a third party? <\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-4fb95b3\" data-block-id=\"4fb95b3\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-4fb95b3\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-4-fb-95-b-3-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-4-fb-95-b-3-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-fe15620 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"fe15620\"><style>.stk-fe15620-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-fe15620-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-fe15620-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-4bdfb70\" data-block-id=\"4bdfb70\"><p class=\"stk-block-text__text\">Once <strong>all tests<\/strong>, including functional tests, have been performed and the certifications described in Chapter O.15 of CEI 0-16 2022-03 have been obtained, CCI manufacturers may issue a self-declaration of conformity to the standard, Annexes O and T. The resulting technical file must be retained for at least 10 years from the product&#8217;s last manufacturing date and must be made available to the regulatory authorities. A third-party body accredited for these annexes of the standard can certify the product&#8217;s conformity, further supporting the self-declaration. <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-39260fc is-style-plain\" data-block-id=\"39260fc\"><style>.stk-39260fc {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-150b699 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"150b699\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-150b699-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-150b699-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-2d718a6\" data-block-id=\"2d718a6\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-a60e45a\" id=\"quali-certificazioni-di-cybersecurity-sono-richieste\" data-block-id=\"a60e45a\"><h6 class=\"stk-block-heading__text\">What cybersecurity certifications are required?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-1c45385\" data-block-id=\"1c45385\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-1c45385\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-1-c-45385-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-1-c-45385-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-7bd3581 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"7bd3581\"><style>.stk-7bd3581-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-7bd3581-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-7bd3581-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-28d80f7\" data-block-id=\"28d80f7\"><p class=\"stk-block-text__text\">Chapter O.15 of CEI 0-16 2022-03 specifies stringent requirements for both hardware and software cyber security. In particular, the use of a cryptographic component capable of detecting and responding to physical tampering is required, certified according to FIPS-140-2 with level 3. Furthermore, certification to IEC 62443-4-1 is required, according to the IsaSecure Secure Development Lifecycle Assessment (SDLA) scheme, of the CCI production process, and to IEC 62443-4-2, according to the IsaSecure Component Security Assurance (CSA) scheme, of the CCI product.  <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk-block stk-7ca3c22 is-style-plain\" data-block-id=\"7ca3c22\"><style>.stk-7ca3c22 {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-413d8ef stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"413d8ef\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-413d8ef-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-413d8ef-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-6eff386\" data-block-id=\"6eff386\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-320f60b\" id=\"le-funzionalita-di-cybersecurity-e-le-relative-certificazioni-devono-essere-integrate-nel-cci-o-nel-router-di-impianto\" data-block-id=\"320f60b\"><h6 class=\"stk-block-heading__text\">Should cybersecurity features and related certifications be integrated into the CCI or plant router?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-2dac4f4\" data-block-id=\"2dac4f4\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-2dac4f4\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-2-dac-4-f-4-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-2-dac-4-f-4-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-38d2bc2 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"38d2bc2\"><style>.stk-38d2bc2-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-38d2bc2-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-38d2bc2-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-966d6c9\" data-block-id=\"966d6c9\"><p class=\"stk-block-text__text\">Chapter O.15 of CEI 0-16 2022-03 requires that the CCI be IEC 62443-4-2 certified according to the IsaSecure CSA scheme (which includes and exceeds the EDSA cited in the standard). This certification requires numerous IT security features, which must be implemented, and tested, by the CCI. Annex O of CEI 0-16 2022-03 establishes that all the required CCI features \u201c<em>\u2026they can also be integrated into one of the other devices constituting the system provided that it is possible to test the features of the aforementioned devices according to the indications of this Annex<\/em>\u201d. In summary, the features must be present, in integrated form or not, in the CCI, and these must be tested and certified.  <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n\n\n\n<details class=\"wp-block-stackable-accordion stk-block-accordion stk-inner-blocks stk-block-content stk--single-open stk-block stk-0cd56bf is-style-plain\" data-block-id=\"0cd56bf\"><style>.stk-0cd56bf {border-style:solid !important;border-color:#dfdad1 !important;border-top-width:0px !important;border-right-width:0px !important;border-bottom-width:1px !important;border-left-width:0px !important;}<\/style>\n<summary class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-22870c2 stk--container-small stk-block-accordion__heading\" data-v=\"4\" data-block-id=\"22870c2\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-22870c2-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-22870c2-inner-blocks\">\n<div class=\"wp-block-stackable-icon-label stk-block-icon-label stk-block stk-c58d40b\" data-block-id=\"c58d40b\"><div class=\"stk-row stk-inner-blocks stk-block-content\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-c167504\" id=\"le-prove-di-conformita-del-cci-possono-essere-svolte-in-un-laboratorio-qualsiasi\" data-block-id=\"c167504\"><h6 class=\"stk-block-heading__text\">Can CCI compliance tests be carried out in any laboratory?<\/h6><\/div>\n\n\n\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-c16c7ee\" data-block-id=\"c16c7ee\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-c16c7ee\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-c-16-c-7-ee-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-c-16-c-7-ee-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"chevron-down\" class=\"svg-inline--fa fa-chevron-down fa-w-14\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 448 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div><\/span><\/div>\n<\/div><\/div>\n<\/div><\/div><\/summary>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-ea1d1f0 stk-block-accordion__content\" data-v=\"4\" data-block-id=\"ea1d1f0\"><style>.stk-ea1d1f0-container{padding-top:0px !important;padding-right:0px !important;padding-bottom:0px !important;padding-left:0px !important;}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-ea1d1f0-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-ea1d1f0-inner-blocks\">\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-1e610cd\" data-block-id=\"1e610cd\"><p class=\"stk-block-text__text\">No, the CEI 0-16 Annex O standard requires several tests, which cannot be carried out in just any laboratory. To comply with the standard, the product must pass the insulation, EMC, noise immunity and climate tests in an ISO 17025 accredited laboratory, and the functional tests in the presence of an ISO 17065 accredited inspection body.<br\/>Once all the tests have been passed, the relevant test and inspection reports have been obtained, and the required certifications have been obtained, at that point the manufacturer self-declares that the CCI complies with CEI 0-16 Annex O and T. The technical file with all the test reports and certifications must be kept and made available for 10 years. <\/p><\/div>\n<\/div><\/div><\/div>\n<\/details>\n<\/div><\/div><\/div>\n<\/details>\n\n<div class=\"wp-block-stackable-columns alignfull stk-block-columns stk-block stk-708428f stk-block-background\" data-block-id=\"708428f\"><style>.stk-708428f {background-color:var(--theme-palette-color-1, #A2D45E) !important;margin-bottom:0px !important;}.stk-708428f:before{background-color:var(--theme-palette-color-1, #A2D45E) !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-708428f-column alignfull\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-e82731e\" data-v=\"4\" data-block-id=\"e82731e\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-e82731e-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-e82731e-inner-blocks\">\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-d84fe4e\" data-block-id=\"d84fe4e\"><style>.stk-d84fe4e-column{max-width:1200px !important;min-width:auto !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-d84fe4e-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-0d987bf\" data-v=\"4\" data-block-id=\"0d987bf\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-0d987bf-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-0d987bf-inner-blocks\">\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-a39f3c7\" data-block-id=\"a39f3c7\"><style>.stk-a39f3c7 {margin-bottom:0px !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-a39f3c7-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-e6f3066\" data-v=\"4\" data-block-id=\"e6f3066\"><style>@media screen and (min-width:690px){.stk-e6f3066 {flex:var(--stk-flex-grow, 1) 1 calc(70% - var(--stk-column-gap, 0px) * 1 \/ 2 ) !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-e6f3066-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-e6f3066-inner-blocks\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-4bcd599\" id=\"vuoi-saperne-di-piu-sul-cci\" data-block-id=\"4bcd599\"><style>.stk-4bcd599 {margin-bottom:0px !important;}<\/style><h4 class=\"stk-block-heading__text\">Want to know more about the CCI?<\/h4><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Contact us for more information on the Central Plant Controller and the ARERA Resolution.<\/p>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-080bcc5\" data-v=\"4\" data-block-id=\"080bcc5\"><style>.stk-080bcc5 {align-self:center !important;}@media screen and (min-width:690px){.stk-080bcc5 {flex:var(--stk-flex-grow, 1) 1 calc(30% - var(--stk-column-gap, 0px) * 1 \/ 2 ) !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-080bcc5-container stk--no-background stk--no-padding\"><div class=\"has-text-align-right stk-block-content stk-inner-blocks stk-080bcc5-inner-blocks\">\n<div class=\"wp-block-stackable-button-group stk-block-button-group stk-block stk-68ee84e\" data-block-id=\"68ee84e\"><div class=\"stk-row stk-inner-blocks stk-block-content stk-button-group\">\n<div class=\"wp-block-stackable-button stk-block-button stk-block stk-b9dc100\" data-block-id=\"b9dc100\"><style>.stk-b9dc100 .stk-button{background:var(--theme-palette-color-8, #ffffff) !important;}.stk-b9dc100 .stk-button .stk--inner-svg svg:last-child, .stk-b9dc100 .stk-button .stk--inner-svg svg:last-child :is(g, path, rect, polygon, ellipse){fill:var(--theme-palette-color-2, #478040) !important;}.stk-b9dc100 .stk-button__inner-text{color:var(--theme-palette-color-4, #2b2b2b) !important;}<\/style><a class=\"stk-link stk-button stk--hover-effect-darken\" href=\"mailto:cci@higecomore.com\" target=\"_blank\" rel=\"noreferrer noopener\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path d=\"M64 112c-8.8 0-16 7.2-16 16v22.1L220.5 291.7c20.7 17 50.4 17 71.1 0L464 150.1V128c0-8.8-7.2-16-16-16H64zM48 212.2V384c0 8.8 7.2 16 16 16H448c8.8 0 16-7.2 16-16V212.2L322 328.8c-38.4 31.5-93.7 31.5-132 0L48 212.2zM0 128C0 92.7 28.7 64 64 64H448c35.3 0 64 28.7 64 64V384c0 35.3-28.7 64-64 64H64c-35.3 0-64-28.7-64-64V128z\"><\/path><\/svg><\/div><\/span><span class=\"has-text-color stk-button__inner-text\">cci@higecomore.com<\/span><\/a><\/div>\n<\/div><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n<\/div><\/div><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-stackable-columns stk-block-columns stk-block stk-f4c925f\" data-block-id=\"f4c925f\"><style>.stk-f4c925f {margin-top:40px !important;}<\/style><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-f4c925f-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-ca6eca1\" data-v=\"4\" data-block-id=\"ca6eca1\"><style>@media screen and (min-width:690px){.stk-ca6eca1 {flex:var(--stk-flex-grow, 1) 1 25% !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-ca6eca1-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-ca6eca1-inner-blocks\"><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-d75e753\" data-v=\"4\" data-block-id=\"d75e753\"><style>@media screen and (min-width:690px){.stk-d75e753 {flex:var(--stk-flex-grow, 1) 1 50% !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-d75e753-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-d75e753-inner-blocks\">\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Controllore Centrale di Impianto (CCI) - Video di presentazione della soluzione Higeco More\" width=\"1500\" height=\"844\" src=\"https:\/\/www.youtube.com\/embed\/35SZN7sh7OY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-7ffd8ae\" data-v=\"4\" data-block-id=\"7ffd8ae\"><style>@media screen and (min-width:690px){.stk-7ffd8ae {flex:var(--stk-flex-grow, 1) 1 25% !important;}}<\/style><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-7ffd8ae-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-7ffd8ae-inner-blocks\"><\/div><\/div><\/div>\n<\/div><\/div>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>REGULATORY COMPLIANCE AND POWER PLANT ADVANCED CONTROL Senergy CCI &#8211; Central Plant Controller The Central Plant Controller (CCI) is a monitoring and control system installed at the point of delivery that allows DSOs to monitor and regulate the generation plant, enabling it to participate in grid balancing.The CCI was introduced in Italy in 2022 with [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-755","page","type-page","status-publish","hentry"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/pages\/755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/comments?post=755"}],"version-history":[{"count":17,"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/pages\/755\/revisions"}],"predecessor-version":[{"id":1300,"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/pages\/755\/revisions\/1300"}],"wp:attachment":[{"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/media?parent=755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}