{"id":1270,"date":"2026-02-06T13:24:44","date_gmt":"2026-02-06T13:24:44","guid":{"rendered":"https:\/\/higecomore.com\/new-arera-resolution-564-2025-whats-new-for-the-cci\/"},"modified":"2026-02-09T10:57:27","modified_gmt":"2026-02-09T10:57:27","slug":"new-arera-resolution-564-2025-whats-new-for-the-cci","status":"publish","type":"post","link":"https:\/\/higecomore.com\/en\/new-arera-resolution-564-2025-whats-new-for-the-cci\/","title":{"rendered":"New ARERA Resolution 564\/2025: What&#8217;s New for the CCI?"},"content":{"rendered":"\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-7e9167f\" data-block-id=\"7e9167f\"><style>.stk-7e9167f {margin-bottom:0px !important;}<\/style><p class=\"stk-block-text__text\">The regulatory framework governing the CCI (Power Plant Controller for Italian standard CEI 0-16 ) continues to evolve. ARERA Resolution 564\/2025, published on December 23, 2025, introduced a series of significant updates impacting deadlines, incentives, and plant classification criteria. <\/p><\/div>\n\n<p>The stated goal is twofold: on the one hand, to make the compliance timelines more realistic, on the other, to encourage the acceleration of interventions in view of spring 2027. In this article, we take stock of the main changes, contextualizing them with respect to previous resolutions. <\/p>\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-5b289ee\" id=\"strong-il-contesto-normativo-cosa-prevedeva-la-delibera-385-2025-strong\" data-block-id=\"5b289ee\"><h4 class=\"stk-block-heading__text\"><strong>Regulatory framework: requirements introduced by Resolution 385\/2025<\/strong><\/h4><\/div>\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-fd3a63b\" data-block-id=\"fd3a63b\"><style>.stk-fd3a63b {margin-bottom:0px !important;}<\/style><p class=\"stk-block-text__text\"><strong>ARERA Resolution 385\/2025\/R\/eel,<\/strong> published on <strong>5 August 2025<\/strong>, marked a fundamental step in the regulatory framework governing the Centralized Plant Controller (CCI). Previously, the obligation to install a CCI was mainly associated with large-scale plants; with Resolution 385\/2025, ARERA extended this requirement to all photovoltaic and wind power plants connected at medium voltage (MV) with a nominal power equal to or greater than 100 kW, whether new or existing. <\/p><\/div>\n\n<p>Il provvedimento ha introdotto l\u2019obbligo di:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Install a CCI (Power Plant Controller) compliant with the CEI 0-16 technical standard<\/li>\n\n\n\n<li>Enable the PF2 functionality, i.e., the ability to limit or modulate the plant\u2019s active power upon request from the Distribution System Operator (DSO).<\/li>\n<\/ul>\n\n<p>With this resolution, even medium-sized plants are now required to meet stricter operational standards, ensuring effective control of energy production and enhancing the stability, safety, and flexibility of the national electricity system.<br\/>For those interested in a practical, hands-on perspective, Higeco More hosted a webinar specifically on Resolution 385\/2025 and CCI compliance, available here:<br\/>\ud83d\udcfa <a href=\"https:\/\/youtu.be\/5QN1jQ31W7s?si=JCmdHq0jJdkno5N5\" target=\"_blank\" rel=\"noopener\">https:\/\/youtu.be\/5QN1jQ31W7s?si=JCmdHq0jJdkno5N5<\/a><br\/>During 2025, some operational challenges emerged, particularly related to the time required to implement communication infrastructures and the verification processes by DSOs. ARERA Resolution 564\/2025 was introduced specifically to address these difficulties. <\/p>\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-ea526f3\" id=\"strong-proroga-delle-scadenze-piu-tempo-per-adeguarsi-strong\" data-block-id=\"ea526f3\"><h4 class=\"stk-block-heading__text\"><strong>Extension of deadlines: more time for compliance<\/strong><\/h4><\/div>\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-d9114ff\" data-block-id=\"d9114ff\"><p class=\"stk-block-text__text\">The first change introduced by ARERA Resolution 564\/2025\/R\/EEL concerns the extension of compliance deadlines. ARERA granted a time extension, differentiated according to the plant\u2019s power class: <\/p><\/div>\n\n<div class=\"wp-block-stackable-icon-list stk-block-icon-list stk-block stk-b21e0a1\" data-block-id=\"b21e0a1\"><style>.stk-b21e0a1 {--stk-icon-list-row-gap:12px !important;--stk-icon-list-marker-color:var(--theme-palette-color-1, #A2D45E) !important;}.stk-b21e0a1 .stk-block-icon-list-item__content{align-items:baseline !important;}<\/style><svg style=\"display:none\"><defs><g id=\"stk-icon-list__icon-svg-def-b21e0a1\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 448 512\"><path d=\"M128 0c17.7 0 32 14.3 32 32V64H288V32c0-17.7 14.3-32 32-32s32 14.3 32 32V64h48c26.5 0 48 21.5 48 48v48H0V112C0 85.5 21.5 64 48 64H96V32c0-17.7 14.3-32 32-32zM0 192H448V464c0 26.5-21.5 48-48 48H48c-26.5 0-48-21.5-48-48V192zM329 305c9.4-9.4 9.4-24.6 0-33.9s-24.6-9.4-33.9 0l-95 95-47-47c-9.4-9.4-24.6-9.4-33.9 0s-9.4 24.6 0 33.9l64 64c9.4 9.4 24.6 9.4 33.9 0L329 305z\"\/><\/svg><\/g><\/defs><\/svg><ul class=\"stk-block-icon-list__ul stk-block-icon-list--column\">\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-7492127\" data-block-id=\"7492127\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-b21e0a1\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\"><strong>Plants with power between 100 kW and 500 kW<\/strong><br>New deadline: 31 March 2028 \u2013 CCI installation and PF2 activation<\/span><\/div><\/li>\n\n\n\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-bbe53b3\" data-block-id=\"bbe53b3\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-b21e0a1\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\"><strong>Power plants \u2265 1 MW<\/strong><br>New deadline: 31 December 2026 \u2013 PF2 functionality activation<\/span><\/div><\/li>\n\n\n\n<li class=\"wp-block-stackable-icon-list-item stk-block-icon-list-item stk-block stk-a5d1622\" data-block-id=\"a5d1622\"><div class=\"stk-block-icon-list-item__content\"><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg aria-hidden=\"true\" width=\"32\" height=\"32\"><use xlink:href=\"#stk-icon-list__icon-svg-def-b21e0a1\"\/><\/svg><\/div><\/span><span class=\"stk-block-icon-list-item__text\"><strong>Plants with power between 500 kW and 1 MW<\/strong><br>New deadline: 31 December 2027 \u2013 CCI installation and PF2 activation<\/span><\/div><\/li>\n<\/ul><\/div>\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-4c95dc9\" data-block-id=\"4c95dc9\"><p class=\"stk-block-text__text\">These extensions (up to 10\u201312 months compared to the original deadlines) aim to make the compliance process more manageable for producers and operators.<\/p><\/div>\n\n<div class=\"wp-block-stackable-image stk-block-image stk-block stk-728ccc6\" data-block-id=\"728ccc6\"><style>.stk-728ccc6 {padding-top:40px !important;padding-right:40px !important;padding-bottom:40px !important;padding-left:40px !important;}<\/style><figure><span class=\"stk-img-wrapper stk-image--shape-stretch\"><img loading=\"lazy\" decoding=\"async\" class=\"stk-img wp-image-1231\" src=\"https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-02.jpg\" width=\"2079\" height=\"1206\" alt=\"Deadlines &#x2013; ARERA Resolution 645\/2025\" srcset=\"https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-02.jpg 2079w, https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-02-300x174.jpg 300w, https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-02-1024x594.jpg 1024w, https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-02-768x446.jpg 768w, https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-02-1536x891.jpg 1536w, https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-02-2048x1188.jpg 2048w\" sizes=\"auto, (max-width: 2079px) 100vw, 2079px\" \/><\/span><\/figure><\/div>\n\n<p>However, it is important not to interpret these extensions as an invitation to delay: the new deadlines are still relatively close, and recent experience shows that CCI compliance requires time, coordination, and careful planning. Acting in advance remains a key factor to avoid operational issues and congestion close to the deadlines. <\/p>\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-e172f32\" id=\"strong-bonus-cci-rimodulazione-delle-finestre-temporali-strong\" data-block-id=\"e172f32\"><h4 class=\"stk-block-heading__text\"><strong>CCI Bonus: Rescheduling of time windows<\/strong><\/h4><\/div>\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-c914382\" data-block-id=\"c914382\"><p class=\"stk-block-text__text\">In addition to the extensions of the obligation, ARERA Resolution 564\/2025 also intervenes on the bonus mechanism.<\/p><\/div>\n\n<div class=\"wp-block-stackable-image stk-block-image stk-block stk-88f80cf\" data-block-id=\"88f80cf\"><style>.stk-88f80cf {padding-top:40px !important;padding-right:40px !important;padding-bottom:40px !important;padding-left:40px !important;margin-bottom:0px !important;}<\/style><figure><span class=\"stk-img-wrapper stk-image--shape-stretch\"><img loading=\"lazy\" decoding=\"async\" class=\"stk-img wp-image-1229\" src=\"https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-01.jpg\" width=\"2079\" height=\"1488\" alt=\"Bonus Resolution ARERA 564\/2025\" srcset=\"https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-01.jpg 2079w, https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-01-300x215.jpg 300w, https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-01-1024x733.jpg 1024w, https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-01-768x550.jpg 768w, https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-01-1536x1099.jpg 1536w, https:\/\/higecomore.com\/wp-content\/uploads\/2026\/02\/Tabella_Scadenze-CCI-01-2048x1466.jpg 2048w\" sizes=\"auto, (max-width: 2079px) 100vw, 2079px\" \/><\/span><\/figure><\/div>\n\n<p>The main changes concern:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>the extension of the first incentive bracket, which allows for longer access to the maximum bonuses;<\/li>\n\n\n\n<li>the reduction of the time intervals of the subsequent tranches, closer to the expiry of the obligation.<\/li>\n<\/ul>\n\n<div class=\"wp-block-stackable-notification stk-block-notification stk--is-warning stk-block stk-f48ccf0 is-style-default\" data-v=\"2\" data-block-id=\"f48ccf0\"><style>.stk-f48ccf0-container{background-color:#a2d45d63 !important;}.stk-f48ccf0-container:before{background-color:#a2d45d63 !important;}<\/style><div class=\"stk-block-notification__content stk-content-align stk-f48ccf0-column stk-container stk-f48ccf0-container stk-hover-parent\"><div class=\"stk-block-content stk-inner-blocks stk-f48ccf0-inner-blocks\">\n<div class=\"wp-block-stackable-icon stk-block-icon stk-block stk-8c6eb70\" data-block-id=\"8c6eb70\"><style>.stk-8c6eb70 {margin-bottom:0px !important;}.stk-8c6eb70 .stk--svg-wrapper .stk--inner-svg svg:last-child, .stk-8c6eb70 .stk--svg-wrapper .stk--inner-svg svg:last-child :is(g, path, rect, polygon, ellipse){fill:#FFFFFF !important;}<\/style><span class=\"stk--svg-wrapper\"><div class=\"stk--inner-svg\"><svg style=\"height:0;width:0\"><defs><lineargradient id=\"linear-gradient-8c6eb70\" x1=\"0\" x2=\"100%\" y1=\"0\" y2=\"0\"><stop offset=\"0%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-8-c-6-eb-70-color-1)\"><\/stop><stop offset=\"100%\" style=\"stop-opacity:1;stop-color:var(--linear-gradient-8-c-6-eb-70-color-2)\"><\/stop><\/lineargradient><\/defs><\/svg><svg data-prefix=\"fas\" data-icon=\"exclamation-triangle\" class=\"svg-inline--fa fa-exclamation-triangle fa-w-18\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 576 512\" aria-hidden=\"true\" width=\"32\" height=\"32\"><path fill=\"currentColor\" d=\"M569.517 440.013C587.975 472.007 564.806 512 527.94 512H48.054c-36.937 0-59.999-40.055-41.577-71.987L246.423 23.985c18.467-32.009 64.72-31.951 83.154 0l239.94 416.028zM288 354c-25.405 0-46 20.595-46 46s20.595 46 46 46 46-20.595 46-46-20.595-46-46-46zm-43.673-165.346l7.418 136c.347 6.364 5.609 11.346 11.982 11.346h48.546c6.373 0 11.635-4.982 11.982-11.346l7.418-136c.375-6.874-5.098-12.654-11.982-12.654h-63.383c-6.884 0-12.356 5.78-11.981 12.654z\"><\/path><\/svg><\/div><\/span><\/div>\n\n\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-e50a2c6\" id=\"strong-il-messaggio-e-chiaro-chi-si-adegua-prima-ottiene-il-massimo-dei-benefici-strong\" data-block-id=\"e50a2c6\"><style>.stk-e50a2c6 {margin-bottom:0px !important;}<\/style><h5 class=\"stk-block-heading__text\"><strong>The message is clear: Those who adapt first reap the greatest benefits.<\/strong><\/h5><\/div>\n\n\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-ebe1792\" data-block-id=\"ebe1792\"><style>.stk-ebe1792 .stk-block-text__text{color:var(--theme-palette-color-4, #2b2b2b) !important;}<\/style><p class=\"stk-block-text__text has-text-color\">Upgrading your system before the deadlines allows you to access the highest bonuses and face the upgrades with greater peace of mind.<\/p><\/div>\n<\/div><\/div><\/div>\n\n<p>A particularly relevant aspect concerns the nature of the envisaged amounts. In this resolution, ARERA also defines the bonuses currently in force as &#8220;minimum recognized.&#8221; The Authority defers to a subsequent resolution, which will be subject to public consultation, for a possible upward revision of the incentives. This means that the amounts known today represent a minimum base and not necessarily the final incentive level.   <\/p>\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-a1d6c94\" id=\"strong-nuova-definizione-di-impianto-esistente-strong\" data-block-id=\"a1d6c94\"><h4 class=\"stk-block-heading__text\"><strong>New definition of \u201cexisting power plant\u201d<\/strong><\/h4><\/div>\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-c5256d2\" data-block-id=\"c5256d2\"><p class=\"stk-block-text__text\">A further clarification introduced by the Resolution concerns the definition of an existing power plant. The reference criterion is no longer the <strong>connection date<\/strong>, but exclusively the <strong>date of the connection request<\/strong>. This change reduces uncertainty for producers, preventing the plant&#8217;s classification from being dependent on the DSO&#8217;s operating times.  <\/p><\/div>\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-3cb3a00\" id=\"strong-strong-il-ruolo-dei-dso-strong-strong\" data-block-id=\"3cb3a00\"><h4 class=\"stk-block-heading__text\"><strong><strong>The role of DSOs<\/strong><\/strong><\/h4><\/div>\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-fef990a\" data-block-id=\"fef990a\"><p class=\"stk-block-text__text\">ARERA Resolution 564\/2025 also intervenes on the role of System Distributors (DSO), granting:<\/p><\/div>\n\n<ul class=\"wp-block-list\">\n<li><strong>an additional year<\/strong> for the implementation of the communication infrastructure with the CCIs;<\/li>\n\n\n\n<li><strong>two months<\/strong> to complete the CCI checks, which start:\n<ul class=\"wp-block-list\">\n<li>from the sending of the paperwork by the manufacturer, or<\/li>\n\n\n\n<li>from the creation of the communication infrastructure, if not yet available at the time of sending.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<p>This extension is probably one of the main reasons behind the overall extensions.<\/p>\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-5312cf5\" id=\"strong-strong-strong-conclusioni-strong-strong-strong\" data-block-id=\"5312cf5\"><h4 class=\"stk-block-heading__text\"><strong><strong><strong>Conclusions<\/strong><\/strong><\/strong><\/h4><\/div>\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-f749bf3\" data-block-id=\"f749bf3\"><p class=\"stk-block-text__text\">ARERA Resolution 564\/2025 introduces a more flexible framework, consistent with the actual timeframes for compliance, without, however, reducing the ambition of the objectives.<\/p><\/div>\n\n<p>The extensions offer more time, but the rescheduling of bonuses and the Authority&#8217;s message remain clear: <strong>planning ahead for compliance with the CCI is a strategic choice, both operationally and economically.<\/strong><\/p>\n\n<div class=\"wp-block-stackable-columns alignfull stk-block-columns stk-block stk-a07e906 stk-block-background\" data-block-id=\"a07e906\"><div class=\"stk-row stk-inner-blocks stk-block-content stk-content-align stk-a07e906-column\">\n<div class=\"wp-block-stackable-column stk-block-column stk-column stk-block stk-43a57f6\" data-v=\"4\" data-block-id=\"43a57f6\"><div class=\"stk-column-wrapper stk-block-column__content stk-container stk-43a57f6-container stk--no-background stk--no-padding\"><div class=\"stk-block-content stk-inner-blocks stk-43a57f6-inner-blocks\">\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-69ef340\" id=\"strong-strong-strong-strong-hai-un-impianto-soggetto-allobbligo-cci-strong-strong-strong-strong\" data-block-id=\"69ef340\"><style>.stk-69ef340 {margin-bottom:0px !important;}<\/style><h5 class=\"stk-block-heading__text\"><strong><strong><strong><strong>Do you have a power plant subject to the CCI obligation?<\/strong><\/strong><\/strong><\/strong><\/h5><\/div>\n\n\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-f9bc86a\" data-block-id=\"f9bc86a\"><p class=\"stk-block-text__text\">Higeco More supports manufacturers and operators in assessing regulatory requirements and planning compliance.<br\/>\ud83d\udc49 <strong>Contact us for a dedicated analysis: <\/strong><a href=\"mailto:cci@higecomore.com\">cci@higecomore.com<\/a><\/p><\/div>\n\n\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-687366e\" id=\"strong-sei-un-installatore-un-system-integrator-o-lavori-in-una-societa-di-ingegneria-strong\" data-block-id=\"687366e\"><style>.stk-687366e {margin-bottom:0px !important;}<\/style><h5 class=\"stk-block-heading__text\"><strong>Are you an installer, a system integrator, or do you work in an engineering company?<\/strong><\/h5><\/div>\n\n\n\n<div class=\"wp-block-stackable-text stk-block-text stk-block stk-900d305\" data-block-id=\"900d305\"><p class=\"stk-block-text__text\">With the Higeco More Academy, we offer a free technical training program for professionals who want to learn more about the installation and integration of our solutions and become certified partners.<br\/>\ud83d\udc49 <strong>Discover the Higeco More Academy and contact us to get started:<\/strong> <a href=\"mailto:academy@higecomore.com\">academy@higecomore.com<\/a><\/p><\/div>\n\n\n\n<div class=\"wp-block-stackable-heading stk-block-heading stk-block-heading--v2 stk-block stk-d419fd8\" id=\"strong-hai-altri-dubbi-sul-controllore-centrale-di-impianto-strong\" data-block-id=\"d419fd8\"><style>.stk-d419fd8 {margin-bottom:0px !important;}<\/style><h5 class=\"stk-block-heading__text\"><strong>Do you have any other questions about the CCI?<\/strong><\/h5><\/div>\n\n\n\n<p>Learn more about this topic by consulting the <a href=\"https:\/\/higecomore.com\/en\/cci-central-plant-controller\/#faq\">FAQ section dedicated to the CCI<\/a>, designed to answer the most common questions about obligations, timelines, and operational aspects.<\/p>\n<\/div><\/div><\/div>\n<\/div><\/div>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The regulatory framework governing the CCI (Power Plant Controller for Italian standard CEI 0-16 ) continues to evolve. ARERA Resolution 564\/2025, published on December 23, 2025, introduced a series of significant updates impacting deadlines, incentives, and plant classification criteria. The stated goal is twofold: on the one hand, to make the compliance timelines more realistic, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23],"tags":[25,24],"class_list":["post-1270","post","type-post","status-publish","format-standard","hentry","category-cci-regulations","tag-arera-resolution","tag-cci"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/posts\/1270","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/comments?post=1270"}],"version-history":[{"count":1,"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/posts\/1270\/revisions"}],"predecessor-version":[{"id":1271,"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/posts\/1270\/revisions\/1271"}],"wp:attachment":[{"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/media?parent=1270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/categories?post=1270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/higecomore.com\/en\/wp-json\/wp\/v2\/tags?post=1270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}